Major Technological Demonstration Projects
 
China’s first imported 600MW
Supercritical coal-fired unit.
 
Put into operation in Huaneng Shidongkou No.2 Power Plant in 1992.
 
 
 
China’s first imported large-scale De-SOx
facility for coal-fired units.
 
Put into operation in Huaneng Luohuang Power Plant in 1993.
 
China’s first domestically-made 600MW Supercritical coal-fire Unit
 
Put into operation in Huaneng Qinbei Power Plant in 2004, winning First Prize for China’s Power Science and Technology.
 
 
 
China’s first domestically-made 1000MW Ultra Supercritical coal-fired unit
 
Put into operation in Huaneng Yuhuan Power Plant in 2006, winning First Prize for National Science and Technology Advancement, Gold Award for National Environmentally-friendly Projects and Gold Award for National Excellent Projects.
 
China’s first domestically-made 600MW Ultra Supercritical coal-fired unit
 
Put into operation in Huaneng Yingkou Power Plant in 2007.
 
 
 
China’s first domestically-made 350MW Supercritical coal-fired unit
 
Put into operation in Huaneng Ruijin Power Plant in 2007.
 
China’s first domestically-made 600MW direct air-cooled coal-fired unit
 
Put into operation in Huaneng Tongchuan Power Plant in 2007.
 
 
 
China’s first CO2 Capture facility for coal-fired units
 
Put into operation in Huaneng Beijing Cogeneration Power Plant in 2008. The facility was designed and constructed by China Huaneng Group, and captures 3000 tons of CO2 per year.
 
One of the world’s largest CO2 Capture facility for coal-fired units
 
Put into operation in Huaneng Shanghai Shidongkou No.2 Power Plant in 2009. The facility captures 120,000 tons of CO2 per year.
 
 
 
Hydropower project with the world’s highest Hyperbolic Arch Dam (294.5m)
 
Put into operation in Huaneng Xiaowan Hydropower Station in 2009.
 
China’s largest single-capacity coal-fired unit (1036MW)
 
Put into operation in Huaneng Haimen Power Plant in 2009, winning Gold Award for National Excellent Projects.
 
 
 
China’s first domestically-made 660MW Supercritical Tower-type Lignite Boiler generating unit
 
Put into operation in Huaneng Jiutai Power Plant in 2009.
 
China’s first IGCC Demonstration Power Project (250MW)
 
Put into operation in Huaneng Tianjin Gasification Co., Ltd. in 2012.
 
 
 
Hydropower project with Asia’s highest Clay Core-wall Rockfill Dam (261.5m)
 
The first unit of the project was put into operation in Huaneng Nuozhadu Hydropower Station in 2012, winning Second Prize for National Science and Technology Advancement.
 
The world’s first High Temperature Gas-cooled Reactor nuclear power project
 
Started construction in Huaneng Shidaowan Nuclear Power Plant. The project has an installed capacity of 200MW, and is scheduled to be operational by 2017.
 
 
 
China’s first Fresnel Concentrated Solar Power (CSP) facility
 
Put into operation in Huaneng Hainan Sanya Nanshan Power Plant in 2012.
 
 